Construction is underway
Drywall being delivered
Drywall
Office area before tear down
New framing for office wall
Office/guest bedroom
The bar before wiring
Door frame to main level
Framing around main beam
Sofet for TV area
Bar
Ugly bar removed
The new bar area
Door removed and some siding for install of new french doors
No Door!
Electricians and Plumbers on-site
Before the network rack and 100a sub-panel
New wiring in basement ceiling
New plumbing for bar sink and dishwasher
Tapping into the copper plumbing for the new bar sink and dishwasher
Wiring for new power in basement to sub-panel and CAT6
Digging hole for new septic system
Digging up old septic
Poop pipe
New Tank hole dug
Poop pipe
Poop pipe
New basement patio door in with temp locks
RV Pad dump and road dump
RV Pad spots
Road to back with RV dump
New septic tanks in the ground
All the new piping requires new grass; old tank crushed
Start of the kitchen demo work
Getting there
almost...
done
Took out the cabinet and counter in favor of another pantry
New Pantry's in the living room
Boxes of cabinets in the kitchen
Boxes of cabinets in the kitchen
Boxes of cabinets in the kitchen
Placed one of the new cabinets
Cooking in the bathroom...
Temp fiber being run..er walked
Damaged cabinet
Another damaged piece
Cabinets going in
Cabinets going in
RV Electric/water trench done
Water trench
Electric and water
Stupid prairie dogs... who wants to come do some shooting?
Another trench shot
Bedroom area getting done
Office area under work
Office area
Slight issue with framing on window
Rec area getting done
Very messy but getting close!
Speaker hole
Bar area not done yet but close
Kitchen area
Fans deployed due to water damage from new pipes; thanks mr plumber...
Drywall done in office
Framing issue resolved
Had to make more headroom for yours truly
Drywall getting taped, mud, float
Accent wall options in rec room
Accent wall options in office
Network coming along-patch panel
Yes on sage
Alabaster white paint done in rec room - on ceiling and walls
AP hanging out of ceiling in rec room
Prepped for hallway paint
Light French Gray in office
And still a mess in the office area, but non-accent walls done
Painting in a dark room
Sage wall in rec room
Other side of sage wall in rec room
About to be dynamic
Dynamic Blue that is
Closet in office area
Bye-bye all white room
Went with a sage accent wall
Testing out basement cabinets
Kitchen sink fitted for counter
The countertop slab
First bit of flooring going in
Filling the cracks
Going into the basement
Rec area flooring is done
Bar flooring is done
Hallway flooring is done
Office flooring is done
Finally able to put up a desk
Chipped countertop on stand-alone
Main kitchen counters in
Unloading shiplap for basement
Some mismatched handles from HD
Main kitchen shiplap going in
Some mismatched boards from HD
Broken piece fixed
Placement test of new bar, Go Astros!
Repainting the kitchen shiplap
Repainting the kitchen shiplap
Polyurethane coating for the basement shiplap
Polyurethane coating